![]() Leakage or deterioration in lines, tanks, valves, drain pumps, and other parts of air or hydraulic systems.The following items must be inspected as defined below: The operator must not leave the controls of the hoist while it is suspendedĪ frequent inspection is an inspection that is performed daily to monthly intervals.There will be no sudden acceleration or deceleration of the moving load. ![]() ![]() The load shall be well secured and properly balanced in the lifting device before it is lifted more than a few inches.The hoist chain or rope shall not be wrapped around the load.The hoist chain or rope shall be free from kinks or twists.The hoist shall not be loaded beyond its rated load capacity.Only designated personnel will be allowed to operate overhead and gantry cranes.General requirements for operating equipment.Training will include but not be limited to: Training will be provided to employees designated to operate overhead and gantry cranes.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |